From drawing to carton

How a charger gets built here
- 01Industrial designThe shape, the interface and the bill of materials, worked backwards from the ex-works price you need to hit.
- 02ToolingA new mould, cut to a shape that is yours.
- 03PCBABoards are placed, reflowed and tested here.
- 04AssemblyShell, board, coil, cable and packaging brought together.
- 05InspectionThree gates: incoming raw material, in-process, and finished goods before packing.The three gates in detail
The mould shop
If no existing model fits, we cut a new mould.
What a new mould costs, its minimum order and its lead time are on the OEM/ODM page.
The PCBA production workshop
The coil, the controller, the protection circuits and the firmware can all be changed for your product.

What the factory can actually do
| Staff | 100–120 |
|---|---|
| Rated monthly output | 50,000 – 450,000 pieces per month, depending on the model |
| Production lead time | 5 – 30 working days; most models 5 – 15 |
| Minimum order | From 20 pieces; most models 200 pieces or fewer |
Come and audit us
Three working days' notice.
The factory: 25th Road of Furong, Gushu, Xixiang Street, Bao'an District, Shenzhen, Guangdong, China.

What you will be shown
- The mould rack, and the mould shop working
- The PCBA production workshop
- The assembly line, mid-batch
- The inspection bench and the hold area
- The packing tables
What you will not be shown
Another customer's tooling, artwork or packaging.
Auditors
Your own auditor or a third-party inspection body (SGS, Bureau Veritas, TÜV) is welcome on the same terms.
Tell us what you need.
Enquiries are answered within one working day.



