The hold
Any batch that fails at a gate is held.

Quality
When raw material and components arrive
Every delivery is inspected against the purchase order before it is accepted into stock.
While the batch is running
The first article off the line is confirmed against the specification before the batch is allowed to run.
After production, before packing into the warehouse
A full check of the finished unit (electrical performance, appearance, and the packaging itself) before it goes into the carton.

Any batch that fails at a gate is held.
Where the fault is ours, the cost of rework or scrap is ours.
If a hold moves your ship date, you are told the day it happens.
A third-party inspection body (SGS, Bureau Veritas, TÜV) or your own agent is welcome at the finished-goods stage.
| Mark | What it actually is | What we can send you |
|---|---|---|
| CE | A manufacturer's declaration of conformity under the applicable EU directives, supported by lab test reports. | The signed EU Declaration of Conformity, the directives and standards claimed, and the lab report behind it. |
| RoHS | A test report per homogeneous material, plus a declaration. | The report and the declaration for the model you are buying. |
| FCC | A third-party grant that carries an FCC ID. | The grant, and the FCC ID, which you can look up yourself in the FCC's public database. |
| Qi / Qi2 (WPC) | A certification issued by a WPC-authorised test lab and listed in the WPC's public database. | The certificate and its registration number, for models that carry one. |
| UN38.3 and MSDS | Transport documents, required for anything containing a lithium cell, which means the power-bank models. | The test summary and the safety data sheet, for the freight forwarder. |
Tell our team the model and the market and the documents come back by email.
